THIS IS A PREVIEW | Read the article here
LEXINGTON, Ky. – Town Branch Park announced today that it has raised $25.4 million dollars – nearly double what was raised previously and more than 80% of the campaign’s initial goal. As a result, the project is moving to the final design and engineering phase.